Afrinpost – Special
The workshops of the Turkish occupation forces continue to complete the construction of a large settlement camp in the area of “Mobata / Ma’batli” to accommodate more settlers in the occupied Kurdish region of Afrin, within the framework of demographic change plans aimed at striking the Kurdish presence on its historical land.
The correspondent of “Afrinpost” in the district center stated that work is still underway on the construction of the settlement camp, which was sponsored by the Qatari-Turkish Muslim Brotherhood Al-Bayan Association, and on an area of one square kilometer in the Nowruz celebration square, located near the village of “Avrazeh”.
The reporter confirmed that the technical workshops completed the leveling of the land and the construction of the sewage canals, as well as bringing the prefabricated bathrooms to the camp site, while it is not known that the tents will be erected or the prefabricated rooms will be brought in.